Contact Us | (636) 343-1211

Contact Us | (636) 343-1211

Installation by Aschinger Electric, largest rooftop array in Missouri

Installation by Aschinger Electric, largest rooftop array in Missouri

Although Aschinger has installed more than 5 megawatts of solar energy across Missouri, Kansas and Illinois, we’re excited to be installing the largest rooftop solar installation in the state of Missouri. This 4,085 panel array is being installed on the roof of the the IKEA store being built in Midtown St. Louis that will open on September 30, 2015. The store’s 259,000-square-foot rooftop solar array will produce enough electricity annually to power 169 homes.

http://www.stlamerican.com/gallery/this_week/collection_ceb2bf92-30ec-11e5-ba2b-2fa0c02b254b.html

No comments

WHAT PEOPLE ARE SAYING

The layouts adapts to the Screen Size of whatever device visitors are using. Nulla consequat.

  • “Our diagrams were a hodgepodge of pieces.  Aschinger looked at our building and gave us a complete set of one line diagrams.  Before, when we had an issue we could grab the pieces but we weren’t even sure if they were right.  Another good thing was their analysis and maintenance recommendations.”

  • “Last week when I was on site I had a chance to talk with two of your electricians, Denny and Rich Butteiger.     I was talking to them about the project and specifically the work they were doing (which was awesome).   It was great to hear them talk with passion and pride about their work.  We also talked about safety and that they saw being safe as much a part of their work as the work itself.

    Again, we appreciate the safety attitude and quality of work that Aschinger puts in place every day.”

     

  • “I would like to offer my sincere thanks and appreciation to Aschinger for a great job. Everyone involved was knowledgeable and professional. This was a monumental achievement for both Duke and Aschinger and we should be proud of the results.”

  • “I just received a phone call from Brian Sword at Gander Mountain to tell me how happy he is with the Fenton install. Please let Aschinger know that we appreciate their efforts. Nothing better than getting this type of call, especially with the eyes on this one. This is a team effort from design, engineering and implementation to make this happen.”

     

     

     

     

  • “We truly appreciate your efforts in all aspects of the construction process, and hope that we will soon be working together again on another project.”

  • Your foreman was irreplaceable in assisting us prepare for the event in the week preceding it, as well as helpful in setting up generators and other electrical equipment the morning of the event. He worked closely with our own staff electricians, and ensured that the event electricity was provided as safe and aesthetically pleasing as possible.