Contact Us | (636) 343-1211

Contact Us | (636) 343-1211

Ameren Missouri Lambert Community Solar Center Construction

Aschinger Electric partnered with Ameren Missouri Lambert Community Solar Center on the construction of their new solar array, located at the St. Louis International Airport. Click here to watch a video showing the latest states of construction.

No comments

WHAT PEOPLE ARE SAYING

The layouts adapts to the Screen Size of whatever device visitors are using. Nulla consequat.

  • “Aschinger Electric completed the installation of the pole light on the John Carrol Parking Lot for the Mural painting on the exterior wall of McGannon Hall. It looks great, Aschinger Electric did a wonderful job.”

  • Your foreman was irreplaceable in assisting us prepare for the event in the week preceding it, as well as helpful in setting up generators and other electrical equipment the morning of the event. He worked closely with our own staff electricians, and ensured that the event electricity was provided as safe and aesthetically pleasing as possible.
  • “When Aschinger showed us the dollars and cents it was a no brainer.  We went from 25-year-old fixtures to state of the art, and saved money in the process.”

  • “Our project was never typical, could become unsafe at any time, was always sensitive to production and yet from the beginning your team has always looked after our best interest. Mike House and Scott Strumpler did an exceptional job!”

  • “Shelli and Greg  and Fred and everyone at Aschinger provide great service to TLC, and we appreciate it very much.”

  • “Your electricians met every challenge and no one could have asked any one of them to do more…The quality and workmanship is excellent and we have a safe temporary service ”

© 2020 | All Rights Reserved | (636) 343-1211 | Contact