Contact Us | (636) 343-1211

Contact Us | (636) 343-1211

New library in Clayton delights readers of all ages

As featured in the the St. Louis Post Dispatch:
CLAYTON — By 4 p.m. Wednesday, the new Mid-County Branch Library had seen 2,100 patrons come through its doors — more than double its typical number of daily visitors, with the post-work influx yet to arrive. Visitors were celebrating the opening of the 18th edition in the St. Louis County Library’s “Your Library Renewed” plan. Nearly two years after the Clayton library closed, they were ready. “We’ve been waiting for it to reopen. We are excited,” said Debby Thomas, who works as a nanny in Clayton. She was sitting on a round purple bench next to a train table, holding a stack of books picked out by 3-year-old Andrew Brown and his 6-year-old sister Allison.
“It’s bright and beautiful in this room. Everything is kid-friendly,” Thomas said.
The children’s area is a point of pride for Mid-County, said Kristen Sorth, St. Louis County Library director. The $8.5 million tear-down and rebuild got a boost from a $30,000 donation to the children’s library by the William T. Kemper Foundation.
“The old library was more adult-oriented than any other branch. There was lots of brown,” said Sorth.
The Mid-County Branch opened in 1977 at 7821 Maryland Avenue. It was — and is — the only county branch to have an underground parking garage, which also got a makeover.
“The old branch was the best it could be, but it just wasn’t accessible,” said Sorth. “It was time.”
The new 18,860-square-foot library is about 15% larger and was designed by Christner Architects to have better separation among books, magazines and DVD stacks, children’s and teen spaces, and collaborative and quiet work areas.
Natural light pours in from a skylight above the circulation desk as well as the floor-to-ceiling windows along Maryland and Central avenues.

Fuchsia and lime green walls announce the children’s area, which features oversize chairs for parent-child reading, round nooks built into the walls and pull-out bins that let little bookworms peruse their favorite titles more easily.
Two-year-old Emmett Florek paged through a “Pete the Cat” board book while singing “The Wheels on the Bus” as his 4-year-old brother, Noah, navigated among the other young browsers poking around the shelves.
“We didn’t used to come to the children’s section here because the layout wasn’t conducive to wrangling a toddler,” said their mother, Liz Florek. “Having a separate area is really nice.”

On the opposite side of the bustling children’s area, a quieter teen room had caught the attention of eighth-graders Alison Booth and Marina Lashmar. “It’s nice to have a space for us,” said Alison, 13. “It’s not for kids, it’s not for adults.”
The new library includes amenities similar to ones added in recent years to the library system’s previous renovations: quiet rooms, vending machines, a business center with copiers and scanners, a multipurpose room and a computer lab.
The $120 million tax initiative funding the renovations was passed by county voters in 2012. Next on the list is the replacement of St. Louis County Library Headquarters and the addition of a history and genealogy and administration building.
On Wednesday, a whiteboard next to the Mid-County circulation desk asked visitors to add a comment saying what they loved about the new branch.
The colorful notes praising the renovation had started to overlap one another, but one stuck out:
“It’s so bright, and open, and wonderful.”

No comments

WHAT PEOPLE ARE SAYING

The layouts adapts to the Screen Size of whatever device visitors are using. Nulla consequat.

  • “I just received a phone call from Brian Sword at Gander Mountain to tell me how happy he is with the Fenton install. Please let Aschinger know that we appreciate their efforts. Nothing better than getting this type of call, especially with the eyes on this one. This is a team effort from design, engineering and implementation to make this happen.”

     

     

     

     

  • “Our project was never typical, could become unsafe at any time, was always sensitive to production and yet from the beginning your team has always looked after our best interest. Mike House and Scott Strumpler did an exceptional job!”

  • “Last week when I was on site I had a chance to talk with two of your electricians, Denny and Rich Butteiger.     I was talking to them about the project and specifically the work they were doing (which was awesome).   It was great to hear them talk with passion and pride about their work.  We also talked about safety and that they saw being safe as much a part of their work as the work itself.

    Again, we appreciate the safety attitude and quality of work that Aschinger puts in place every day.”

     

  • “I would like to offer my sincere thanks and appreciation to Aschinger for a great job. Everyone involved was knowledgeable and professional. This was a monumental achievement for both Duke and Aschinger and we should be proud of the results.”

  • “We were quite pleased with Aschinger.  Our previous infrascan company wasn’t nearly as thorough.”

  • “Aschinger Electric completed the installation of the pole light on the John Carrol Parking Lot for the Mural painting on the exterior wall of McGannon Hall. It looks great, Aschinger Electric did a wonderful job.”

© 2020 | All Rights Reserved | (636) 343-1211 | Contact